Thoughts & Stories

House Extension in Malaysia: Approvals, Setbacks and Your Neighbours
Extending a terrace or semi-D house in Malaysia needs the council's approval first. What counts as an extension, setbacks, your neighbour's consent and the CCC.

Architect Fees in Malaysia: How the LAM Minimum Fee Scale Works
Architect fees in Malaysia follow a legal minimum scale, the Architects (Scale of Minimum Fees) Rules 2010. For an individually designed house or a renovation, the minimum basic fee is 10% of the cost of works up to RM500,000, then a reducing percentage, paid in five stages.

Bungalow House Design in Malaysia: The Rules That Shape Your Floor Plan
A bungalow design starts with how you live, but the lot and the rules decide what fits: setbacks of about 20 feet at the front and 10 feet at the sides and rear, up to three storeys, and minimum room sizes, ceiling heights and windows set by the building by-laws.

Pelukis Pelan or Architect? Who May Submit Your Building Plans in Malaysia
A pelukis pelan can draw your plans, but only a qualified person may submit them to the council. A registered building draughtsman may submit plans only for buildings up to two storeys and 300 square metres, in the council areas on their registration; anything bigger is beyond their limits.

House Renovation in Malaysia: Which Permit You Need and When an Architect Must Submit
Renovating a house in Malaysia usually needs the local council's permission before work starts. Small works go through a minor works permit; extensions and structural changes need plans submitted by an architect or another principal submitting person, and a CCC at the end.

Building a House on Your Own Land in Malaysia: The Approvals, Step by Step
Building on your own land (bina rumah atas tanah sendiri) needs land whose title allows a house, planning permission or an exemption, approved building plans and, at the end, a CCC. This guide explains each approval in order and who handles it.